Description of performed works:
Production, delivery, installation and commissioning of switcboard type SIVACON 8PT
The expansion of the Pier C is part of a large project of reconstruction and expansion of the entire existing terminal building. A new substation 10/0.4kV 3x1250kVA was built to power the extended part of the terminal building, waiting rooms from C7 to C14.
Montprojekt delivered, installed and put into operation a low-voltage 0.4 kV switchboard type SIVACON 8PT.
The switchboard is equipped with withdrawable air circuit breakers type 3WL Siemens In=2000A in the supply and connection panels.
Molded case circuit breakers type 3VA Siemens with electronic trip units ETU350 LSI in output panels.
Capacitor batteries EPCOS in power factor correction panels.
The plant is connected via Modbus TCP communication to the Power Scada remote monitoring system, where in real time operator can see states of all circuit breakers. It is also possible to remotely control supply and connection circuit breakers.